There are three main types of asbestos survey in the UK: the management survey, the refurbishment and demolition survey and the re-inspection survey. Which one you need depends on whether the building is in everyday use, about to undergo building work or already has a record of known asbestos.
If you are responsible for a building constructed before 2000, choosing the right survey protects the people who use it and keeps you on the right side of the law. This guide explains when each survey is needed, what it involves, who the duty holder is and why HSG264 and UKAS accreditation matter.
Is an asbestos survey a legal requirement?
Yes, an asbestos survey is effectively a legal requirement for non domestic premises built before 2000, because the owner or manager has a legal duty to manage any asbestos in them. That duty comes from Regulation 4 of the Control of Asbestos Regulations 2012 (CAR 2012).
Failing to identify and manage asbestos is a criminal offence. The Health and Safety Executive (HSE) can issue prohibition notices, bring prosecutions that lead to large fines and, in serious cases, seek prison sentences.
A survey gives you the information you need to write an asbestos management plan. That plan keeps everyone who uses or works on the building safe, from employees to a visiting plumber.
What types of asbestos survey are there?
The three types of asbestos survey are management, refurbishment and demolition, and re-inspection, each matched to what is happening in the building. HSE replaced the old numbered system in 2010 to make it easier to order the right one.
Under the old system, a Type 1 survey was a visual inspection only and is no longer used, a Type 2 survey added sampling and is now largely covered by the management survey, and a Type 3 survey was fully intrusive and is now the refurbishment and demolition survey.
| Survey type | Purpose, intrusion and when to commission |
|---|---|
| Management | Day to day safety and compliance. Low intrusion with sampling. Commission it when you occupy, manage or buy a building. |
| Refurbishment | Safety during specific building work. Highly intrusive in the areas affected. Commission it before any renovation or structural change. |
| Demolition | Safety before a building is knocked down. Fully intrusive throughout. Commission it before demolition. |
| Re-inspection | Monitoring known asbestos. Visual checks. Commission it every year as part of the management plan. |
What is a management asbestos survey?
A management asbestos survey is the standard survey for a building in everyday use, and it finds asbestos that could be damaged or disturbed during normal occupation, maintenance and installation work. If your building is a workplace, a shop or the communal areas of a residential block, this is almost certainly the survey you need.
The survey is generally non intrusive. The surveyor inspects all accessible areas, including floor ducts, ceiling voids, pipework, boiler rooms, storage cupboards and lofts, and takes samples of suspect materials. A laboratory then confirms whether each sample contains asbestos and which type, such as chrysotile, amosite or crocidolite.
The surveyor then gives each material a material assessment score based on:
- The product type, for example loose insulation or hard wearing floor tiles.
- The extent of damage or deterioration.
- Any surface treatment, such as paint or a sealant.
- The type of asbestos.
The duty holder uses these scores to decide which materials need urgent attention and which can stay safely in place.
Not sure which survey you need?
Tell us about the building and your plans, and a P402 certified surveyor will recommend the right survey. Your digital report follows within 36 hours, with UKAS accredited laboratory analysis included in a fixed fee.
- P402 certified surveyor
- UKAS accredited laboratory
- No hidden lab costs
What is a refurbishment and demolition asbestos survey?
A refurbishment and demolition (R&D) survey is an intrusive survey required before any part of a building is upgraded, refurbished or demolished. It finds asbestos hidden inside the structure that a management survey cannot reach.
Asbestos was often used as fire protection or insulation deep within a building. An R&D survey looks for it in places such as:
- Cavity walls, which may contain asbestos debris or loose fill insulation.
- Floor voids, where older tiles or bitumen may sit under modern carpet and screed.
- Internal partitions, where asbestos insulating board may be hidden behind outer layers.
The surveyor uses hand and power tools to open voids, lift floorboards and break through walls. Because this can release fibres, the area being surveyed must be empty and is often sealed off.
If you are a contractor, or a homeowner hiring a builder, make sure an R&D survey is completed before work begins. Under the Construction (Design and Management) Regulations 2015, the client must give the contractor pre construction information, including the asbestos status of the work area.
What is an asbestos re-inspection survey?
An asbestos re-inspection survey is a repeat visit by a qualified surveyor to check the condition of every asbestos material already listed on the asbestos register. Asbestos can deteriorate over time or be knocked by tenants and cleaners, so its condition must be monitored.
HSE recommends checking asbestos materials at least every 12 months, and higher risk materials, such as unsealed pipe lagging in a busy basement, may need more frequent checks. The surveyor updates the register with any changes. If a material that was in good condition is now damaged, the management plan must be updated with action such as encapsulation or removal.
Who is the duty holder for asbestos?
The duty holder is the person or organisation responsible for maintaining a non domestic building, and they are legally responsible for managing its asbestos. Under CAR 2012, that is usually:
- The owner, if they occupy the building or it is empty.
- The tenant or employer, if the lease makes them responsible for maintenance and repair.
- The managing agent, if the owner has passed maintenance duties to them under contract.
The duty holder must make sure the survey is carried out, keep the asbestos register up to date and share it with anyone likely to disturb the building fabric.
Why do HSG264 and UKAS accreditation matter?
HSG264 and UKAS accreditation matter because they show that a survey has been carried out to the recognised national standard. HSG264, Asbestos: The Survey Guide, is HSE’s guidance on how surveys must be done, and every professional survey should follow it.
The United Kingdom Accreditation Service (UKAS) independently assesses the competence of surveying organisations and laboratories. Analysis of asbestos samples must be done by an accredited laboratory, and HSE strongly recommends using an accredited organisation for the survey itself. Accreditation shows that:
- Surveyors hold the right qualifications, such as BOHS P402.
- Equipment is properly maintained and calibrated.
- Reports are consistent and meet the required safety standards.
How do you choose the right asbestos survey?
Choose a management survey if the building is in normal use, a refurbishment or demolition survey before any building work and a re-inspection each year once asbestos is on the register. If you are unsure, describe the building and your plans to a surveyor, who can recommend the right one.
Asbestos in good condition that is left undisturbed is usually safe, but you can only manage what you have identified. A survey carried out to HSG264 by qualified professionals is the foundation of a safe workplace, whether you run a business or are planning your next development.
Frequently asked questions about asbestos surveys
Do I need an asbestos survey for my house?
The duty to manage asbestos does not apply to a private home you live in. If your home was built before 2000 and you are hiring builders for major work, you should arrange a refurbishment and demolition survey so they are protected from exposure.
How much does an asbestos survey cost?
With TS Asbestos, sample testing starts from £100 and a full sample survey starts from £175. The final fixed fee depends on the size of the building, its age and the number of samples needed.
How long does an asbestos survey take?
A management survey of a typical office can usually be completed in a single day, and TS Asbestos sends the digital report within 36 hours of the visit. Refurbishment and demolition surveys take longer on site because they are intrusive.
What are the three main types of asbestos?
The three main types are crocidolite (blue), amosite (brown) and chrysotile (white). Crocidolite is often considered the most dangerous, amosite is common in insulating boards, and chrysotile was the most widely used.
What replaced Type 1, 2 and 3 asbestos surveys?
In 2010, HSE replaced Type 1, 2 and 3 surveys with management surveys and refurbishment and demolition surveys. The type now depends on how the building will be used or what work is planned.
Book the right asbestos survey
Send us the property address and what you need the survey for. We will confirm the survey type, quote a fixed fee and arrange a visit at a time that suits you.
- Digital report within 36 hours
- DBS checked surveyor